Progress Report on the Playhouse Refurbishment
We are pleased to report that the building works are now well under way and we have the photographs to prove it! See below some of the photographs showing what is going on.

The raked seating area to the left of the auditorium exposed ready to level off and provide access to the lift

Lewis removing the stud wall between the foyer and the bar

Gareth removing the wall between the men’s dressing room and the toilet

The Foyer and Bar area opened up
